SuburbanConsultingEngineersSuburbanConsultingEngineers

Projects


Memorial Park - Mt. Arlington

Oldwick Sidewalks - Tewksbury Twp.

Freedom Park - Randolph Twp.

Public Beach - Mt. Arlington



MUNICIPAL ENGINEERING PROJECTS


pic1
MT. ARLINGTON MEMORIAL PARK

CLIENT: Borough of Mt. Arlington
DATES OF SERVICES: 2005

DESCRIPTION: Mt. Arlington’s Memorial Park was an existing passive recreation area located within the central limits of the Borough.  This park was a public facility with poor parking allocation and limited pedestrian accessibility.  There was no American Disability Act (ADA) accessibility and the overall atmosphere of the park did not provide for a satisfying experience for park patrons.  This project is a shining example of what can be accomplished through a joint public and private effort with a single unified goal of public sector enhancement.















pic2
OLDWICK SIDEWALK IMPROVEMENTS

CLIENT: Township of Tewksbury
DATES OF SERVICES: 2007 - 2013

DESCRIPTION: In 2007 Tewksbury Township initiated the process of obtaining funding for the replacement of sidewalks within the Oldwick Village.  The Oldwick Village dates to the late 1700’s, with much of the sidewalk having been installed by the individual property owners in a piecemeal fashion throughout the past 150 years.  As such, the sidewalk was made of various materials depending on the needs, material availability, and preference of each property owner. 















pic3
FREEDOM PARK

CLIENT: Township of Randolph
DATES OF SERVICES: 1999 - 2002

DESCRIPTION: The Township of Randolph acquired 176 acres of wooded and open farmland in 1997, using Township and County funds.  In 1999, SCE was retained to develop the concept plan, and advance the detailed design and permitting of the Freedom Park development, a 38-acre recreation facility.  It contains 7 athletic fields, basketball courts, bike and pedestrian trails, a picnic pavilion, two (2) concession stands with restrooms, maintenance garage, and parking. 













MTA Beach
MT. ARLINGTON PUBLIC BEACH IMPROVEMENTS

CLIENT: Borough of Mt. Arlington
DATES OF SERVICES:
2010 - 2013

DESCRIPTION: The Project commenced with the preparation of a master plan for the rehabilitation of the entire property to promote the use of the property by all age groups.  The master plan was established that identified four major phases requiring multiple projects to be implemented in the order of priority.   The initial phase was for the rehabilitation of the existing municipal dock that was found to exhibit significant structural defects. 

Committed to Excellence, Economy, and Environment.