SuburbanConsultingEngineersSuburbanConsultingEngineers

Projects


Newton Memorial Hospital


Camp Merry Heart


Fairview Lake YMCA


Facility Research Campus




PRIVATE CLIENT PROJECTS


memorialhospital
NEWTON MEDICAL CENTER

CLIENT: Newton Medical Center
DATES OF SERVICES: 2003 - 2004

DESCRIPTION: SCE prepared the site planning and engineering design for an addition to the hospital emergency department including expansion and revised layout to the parking areas and heli-port. Project included Preliminary & Final Site Plan approvals:  Survey, Site Layout, New Parking Area, Revised Site Circulation, Emergency Room and Main Entrance Vehicular and Pedestrian Access, Grading, Utility Relocations, New Heli-Port, Drainage, Stormwater Management, Retaining Wall Design, Expert Testimony, Permitting and Contract/Construction Administration.















campmerryheart
CAMP MERRY HEART

CLIENT: Easter Seals New Jersey
DATES OF SERVICES: 2006 - 2011

DESCRIPTION: Camp Merry Heart facility provides summer camp housing and developmental activities for participants with special needs.  The breakout of surface discharge from the old septic disposal systems at the camp gave Easter Seals New Jersey cause to pursue the necessary corrective measures to permit construction of new subsurface disposal systems for the camp.  The site is situated in the Highlands Preservation and thereby any disturbance of construction activities required strict compliance with the regulations of the Highlands Rule. 















YMCA
FAIRVIEW LAKE YMCA

CLIENT: Fairview Lake YMCA Camps
DATES OF SERVICES: 2011 - Present

DESCRIPTION: The Fairview Lake YMCA Camp (YMCA) requested proposals for the completion of a Feasibility Study associated with the installation of proposed facilities developed as a result of a recent master planning charrette. The Feasibility Study included the re-development of the Master Plan that took into consideration the vast complexities of the surrounding environmental sensitive lands.  The Feasibility Study was created to address all aspects of a development plan including the establishment of phasing and construction cost estimating to assist in budget preparations. 















bristol
FACILITY RESEARCH CAMPUS

CLIENT: O’Brien and Gere Engineers
DATES OF SERVICES: 2011 - Present

DESCRIPTION: The on-site campus located in NJ is a research facility with a population of nearly 2,000 employees.  The campus was served by an on-site water system, but with limited capacity for expansion.  The client identified an alternative water supply to the on-site system and arranged for the extension of service to the Campus.  The on-campus improvements necessary to accommodate the new service arrangement included water service main extensions, prefabricated potable and fire system booster stations, disinfections system, distribution network enhancements and reinforcements.











Committed to Excellence, Economy, and Environment.